Thursday, October 10, 2019
Small-Scale I.T. Infrastracture
This paper entitled I.T. Infrastracture for Andrea Stevens Cosmetics is a pre-formal draft for the proposed network design for the Stevens Cosmetics Information Technology system.This paper discusses the fundamental technical specifications needed to develop and implement the procedures needed to upgrade the hardware, software and procedures currently used by the company in the manufacturing and sales of the company's merchandise.This paper is limited as a draft and not intended as a complete project specification and technical reference for the project. Further verification and research is advised.In order to guarantee continuous usability of computer terminals and adaptability to emerging technologies for at least five (5) years in the future, it is advised that all terminals be upgraded to the latest Intel Core 2 Duo processors with at least 1 Gigabyte of memory. Video, sound and network cards are not mandatory. A wireless network adapter or two (2) USB 2 ports, however, are requi red in order to accommodate the network requirements to be discussed on the next points.Instead of individually shared printers, multi-functional network printers with the feature to set its own IP address is recommended. This will eliminate the dependency of the printers in having a host computer to necessitate its operation.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.